Formation Pressure from Shut-In Drillpipe Pressure
Pf = 0.00980665 × MW × TVD + SIDPP
click formula to derive ↑
Inputs
lb/gal
ft
psi
Description
Calculates actual formation (pore) pressure from a stabilized shut-in drillpipe pressure reading after a kick — the standard first step in well control kick analysis, used to determine the kill mud weight needed to regain balance.
Variables
| Symbol | Unit | Description |
|---|---|---|
| Pf | psi | Formation Pressure |
| Pf_EMW | lb/gal | Formation Pressure (EMW) |
| MW | lb/gal | Mud weight in the hole at the time the well was shut in, before any weight-up. |
| TVD | ft | True vertical depth of the influx (kick) zone — commonly taken as bit depth at the time of the kick. |
| SIDPP | psi | Stabilized drillpipe pressure read after shutting in the well following a kick — read only once the gauge has stopped rising or falling. |
Assumptions
- SIDPP has fully stabilized before being read — a still-rising or falling gauge indicates the well has not yet reached true shut-in equilibrium
- The drillpipe is full of the original (pre-kick) mud with no significant gas migration into the drillstring
- TVD used is the depth of the influx zone (commonly assumed at or near bit depth at the time of the kick), not surface or measured depth
Limitations
- A U-tubing effect or plugged drillstring can produce a SIDPP reading that does not reflect true formation pressure — cross-check against shut-in casing pressure (SICP) for consistency
- Significant gas migration up the drillstring before shut-in raises the apparent SIDPP independent of actual formation pressure — read SIDPP as early as practical after shut-in
- Assumes a single-phase mud column above the kick zone in the drillstring, which is the basis for using SIDPP (rather than SICP) here
Use Cases
- → Post-kick well control response: Determine the actual formation pressure immediately after shutting in a well following a kick, as the first step in planning a kill.
- → Pore pressure calibration: Use a confirmed kick as a direct pressure data point to calibrate or validate pre-drill pore pressure predictions (e.g. from the Eaton method) for the remaining well.
- → Mud weight program revision: Feed the calculated formation EMW into the mud weight program to ensure the next hole section is drilled with adequate overbalance.
Related Calculations
Region Notes
Permian Basin
Wolfcamp/Bone Spring kicks are most often modest gas kicks from mildly overpressured intervals — SIDPP values of 200-800 psi are typical when caught early; values significantly above this should prompt a check for a deeper, more pressured zone than planned.
Haynesville
Severely overpressured Haynesville gas kicks can produce SIDPP in the thousands of psi — verify gauge readings and well control equipment ratings before proceeding with standard kill procedures.
Global
Always read SIDPP (and SICP) only after both gauges have stabilized for several minutes — premature readings are the most common source of an incorrect kill mud weight.
References
Need geoscience support? BauerCalc is just one of the tools we build. If you're looking for independent expertise in well planning, geosteering, reservoir characterization, or opportunity evaluation, visit BauerSubsurface.com.